CPC Main Group
E01B 1/00 Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway (draining by trenches, culverts, or conduits E01F5/00)
3 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open