Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
CPC Main Group
E01B 29/00

Laying, rebuilding, or taking-up tracks; Tools or machines therefor (E01B27/00, E01B31/00 take precedence)

10 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • E01B 29/02 Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings (E01B29/04 takes precedence)
  • E01B 29/04 Lifting or levelling of tracks (lifting devices in general B66F)
  • E01B 29/05 Transporting, laying, removing, or renewing both rails and sleepers (as assembled units E01B29/02)
  • E01B 29/32 Installing or removing track components, not covered by the preceding groups, e.g. sole-plates, rail anchors (E01B31/26 takes precedence)
  • E01B 29/40 Means or arrangements for temporarily supporting laid tracks, or rails or sleepers in the track (temporary fishplates E01B11/18)