Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
CPC Subgroup
F16L 1/028

in the ground (F16L1/026 takes precedence)

Full Title

Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence) > in the ground (F16L1/026 takes precedence)

3 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • F16L 1/032 the pipes being continuous (F16L1/038 takes precedence)
  • F16L 1/036 the pipes being composed of sections of short length (F16L1/038 takes precedence)
  • F16L 1/038 the pipes being made in situ