Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
CPC Subgroup
F16L 1/032

the pipes being continuous (F16L1/038 takes precedence)

Full Title

Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence) > in the ground (F16L1/026 takes precedence) > the pipes being continuous (F16L1/038 takes precedence)