Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
CPC Main Group Additional Only
Y04S 20/00

Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof

4 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • Y04S 20/12 Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
  • Y04S 20/14 Protecting elements, switches, relays or circuit breakers
  • Y04S 20/30 Smart metering, e.g. specially adapted for remote reading