Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
F16L 1/14

between the surface and the bottom

Introduced: January 1990

Full Title

Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on or under water > between the surface and the bottom

IPC and CPC are identically structured here. All 1 subcodes exist in both systems.

IPC defines codes here since 1995.

Child Classifications

Navigate with arrow keys, Enter to open

  • F16L 1/15 vertically since 1995 IPC+CPC Available in IPC and CPC