G01C 5/00 Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels (G01C3/20, G01C3/30 take precedence)
Introduced: September 1968
Title
Titles differ between systems:
IPC: Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
CPC: Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels (G01C3/20, G01C3/30 take precedence)
Full Title
Full titles differ between systems:
Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels (G01C3/20, G01C3/30 take precedence)
Of 4 combined children, 3 exist in both systems.
1 codes are CPC-only extensions.
Child Classifications
Navigate with arrow keys, Enter to open
- G01C 5/04 Hydrostatic levelling, i.e. by flexibly interconnected liquid containers at separated points IPC+CPC Available in IPC and CPC