DIFF Main Group
G01M 10/00 Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels
Introduced: September 1968
No child classifications to compare. This is a leaf node in both IPC and CPC.
G01M 10/00 Introduced: September 1968
No child classifications to compare. This is a leaf node in both IPC and CPC.