Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
G05B 9/02

electric

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Safety arrangements > electric

CPC:

Safety arrangements (G05B7/00 takes precedence; safety arrangements in program-control systems G05B19/048, G05B19/406) > electric

IPC and CPC are identically structured here. All 1 subcodes exist in both systems.

IPC defines codes here since 1974.

Child Classifications

Navigate with arrow keys, Enter to open

  • G05B 9/03 with multiple-channel loop, i.e. redundant control systems since 1974 IPC+CPC Available in IPC and CPC