DIFF Subgroup
G21D 3/06 responsive to faults within the plant (in the reactor G21C9/00)
Introduced: September 1968
Title
Titles differ between systems:
IPC: responsive to faults within the plant
CPC: responsive to faults within the plant (in the reactor G21C9/00)
Full Title
Full titles differ between systems:
IPC:
Control of nuclear power plant > Safety arrangements > responsive to faults within the plant
CPC:
Control of nuclear power plant (control of nuclear reaction in general G21C7/00) > Safety arrangements (emergency protection of reactor G21C9/00) > responsive to faults within the plant (in the reactor G21C9/00)
No child classifications to compare. This is a leaf node in both IPC and CPC.