DIFF Subgroup
H02G 9/08 in tunnels
Introduced: September 1968
Full Title
Installations of electric cables or lines in or on the ground or water > in tunnels
No child classifications to compare. This is a leaf node in both IPC and CPC.
H02G 9/08 Introduced: September 1968
Installations of electric cables or lines in or on the ground or water > in tunnels
No child classifications to compare. This is a leaf node in both IPC and CPC.