DIFF Subgroup
H04B 3/46 Monitoring; Testing
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Line transmission systems > Details > Monitoring; Testing
CPC:
Line transmission systems (combined with near-field transmission systems H04B5/00) > Details > Monitoring; Testing
IPC and CPC are identically structured here. All 4 subcodes exist in both systems.
1 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- H04B 3/462 Testing group delay or phase shift, e.g. timing jitter since 2015 IPC+CPC Available in IPC and CPC