DIFF Subgroup
H04L 47/30 in combination with information about buffer occupancy at either end or at transit nodes
Introduced: January 2022
Full Title
Full titles differ between systems:
IPC:
Traffic control in data switching networks > Flow control; Congestion control > in combination with information about buffer occupancy at either end or at transit nodes
CPC:
Traffic control in data switching networks (arrangements for detecting or preventing errors in the information received H04L1/00) > Flow control; Congestion control > in combination with information about buffer occupancy at either end or at transit nodes
No child classifications to compare. This is a leaf node in both IPC and CPC.