IPC Main Group
B23Q 7/00 Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
Introduced: September 1968
Last revised: January 2006
Classification Context
- Section:
- PERFORMING OPERATIONS; TRANSPORTING
- Class:
- MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- Subclass:
- DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL, CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
10 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- B23Q 7/02 by means of drums or rotating tables or discs
- B23Q 7/03 by means of endless chain conveyors
- B23Q 7/04 by means of grippers
- B23Q 7/05 by means of roller-ways
- B23Q 7/06 by means of pushers
- B23Q 7/08 by means of slides or chutes
- B23Q 7/1 by means of magazines
- B23Q 7/12 Sorting arrangements
- B23Q 7/14 co-ordinated in production lines
- B23Q 7/16 Loading work on to conveyors; Arranging work on conveyors, e.g. varying spacing between individual workpieces