Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Subgroup
E01C 23/1

for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure

Introduced: September 1968

Last revised: January 2006

Full Title

Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces > Devices or arrangements for working the finished surface; Devices for repairing the surface of damaged paving > for raising or levelling sunken paving; for filling voids under paving; for introducing material into substructure

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
Subclass:
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR