IPC Main Group
E01D 12/00 Bridges characterised by a combination of structures not covered as a whole by a single one of groups
Introduced: January 1995
Last revised: January 2006
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- Subclass:
- BRIDGES