IPC Main Group
E01H 8/00 Removing undesirable matter from the permanent way of railways; Removing undesirable matter from tramway rails
Introduced: September 1968
Last revised: January 2006
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- Subclass:
- STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; CLEANING LAND; DISPERSING FOG IN GENERAL
Related Keywords
CLEANING permanent ways of railwaysCLEANING tramway railsCLEARING permanent ways of railwaysCLEARING tramway railsremoving ICE from railway or tramway tracksMELTING ice or snow on railway trackscleaning permanent way of RAILWAY(S),RAILROAD(S)removing REFUSE from permanent ways of railwaysremoving REFUSE from tramway tracksremoving SNOW from railway or tramway tracksSNOW ploughs
2 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
Top Applicants
Top 10 applicants by patent filingsfor class E01, 2013–2023, worldwide · Source: EPO PATSTAT
- CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP COMPANY 2,096
- CHANG AN UNIVERSITY 1,878
- ROAD & BRIDGE INTERNATIONAL COMPANY 1,796
- CREEC (CHINA RAILWAY ERYUAN ENGINEERING GROUP) 1,493
- CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP COMPANY 1,327
- CCCC FIRST HIGHWAY ENGINEERING GROUP COMPANY 1,133
- CCCC SECOND HARBOUR ENGINEERING COMPANY 1,029
- PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN AT 935
- TONGJI UNIVERSITY 899
- CATERPILLAR PAVING PRODUCTS US 868