IPC Subgroup
E02B 3/28 Fender piles
Introduced: January 1990
Last revised: January 2006
Full Title
Engineering work in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering work in general > Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards > Fender piles
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- HYDRAULIC ENGINEERING
Related Keywords
fender PILE(S) for harbours