IPC Main Group
E02B 7/00 Barrages or weirs; Layout, construction, methods of, or devices for, making same
Introduced: September 1968
Last revised: January 2006
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- HYDRAULIC ENGINEERING
Related Keywords
BARRAGES for hydraulic engineeringCRIBWORK for subaqueous structuresDOCK(S) gatesexcavating for RESERVOIR(S) as building structuresWEIRS for hydraulic engineering
3 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open