IPC Subgroup
E02D 1/08 after finishing the foundation structure
Introduced: September 1968
Last revised: January 2006
Full Title
Investigation of foundation soil > after finishing the foundation structure
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES