IPC Main Group
E02D 13/00 Accessories for placing or removing piles or bulkheads
Introduced: September 1968
Last revised: January 2006
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
Filing statistics
IPC E02D 13/00 belongs to the parent subclass E02D, which recorded 300,539 patent applications worldwide between 2013 and 2023. Annual filings grew from 11,339 in 2013 to 42,780 in 2023 (+277%). The most active applicants in class E02 are KOMATSU (3,549 applications), CATERPILLAR (2,893 applications) and HITACHI CONSTRUCTION MACHINERY COMPANY (2,390 applications).
Source: EPO PATSTAT, worldwide filings
5 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 13/02 specially adapted for placing or removing bulkheads
- E02D 13/04 Guide devices; Guide frames
- E02D 13/06 for observation while placing
- E02D 13/08 Removing obstacles
- E02D 13/1 Follow-blocks of pile-drivers or like devices
Top Applicants
Top 10 applicants by patent filingsfor class E02, 2013–2023, worldwide · Source: EPO PATSTAT
- KOMATSU JP 3,549
- CATERPILLAR US 2,893
- HITACHI CONSTRUCTION MACHINERY COMPANY JP 2,390
- HITACHI CONSTRUCTION MACHINERY COMPANY 2,340
- POWERCHINA HUADONG ENGINEERING CORPORATION 2,336
- CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION 2,174
- SGCC(STATE GRID CORPORATION OF CHINA) 2,119
- HOHAI UNIVERSITY 1,821
- KOMATSU 1,775
- POWERCHINA GUIYANG ENGINEERING CORPORATION 1,725