IPC Subgroup
E02D 3/061 Tampers with directly acting explosion chambers
Introduced: January 1980
Last revised: January 2006
Full Title
Improving or preserving soil or rock, e.g. preserving permafrost soil > Improving by compacting > by tamping or vibrating, e.g. with auxiliary watering of the soil > Tampers with directly acting explosion chambers
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
- Subclass:
- FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES