Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Subgroup
E02D 3/08

by inserting stones or lost bodies, e.g. compaction piles

Introduced: September 1968

Last revised: January 2006

Full Title

Improving or preserving soil or rock, e.g. preserving permafrost soil > Improving by compacting > by inserting stones or lost bodies, e.g. compaction piles

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL-SHIFTING
Subclass:
FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES