Skip to content
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Subgroup
E21B 43/01

specially adapted for obtaining from underwater installations

Introduced: September 1968

Last revised: January 2006

Full Title

Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells > specially adapted for obtaining from underwater installations

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
EARTH OR ROCK DRILLING; MINING
Subclass:
EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS

2 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • E21B 43/013 Connecting a production flow line to an underwater well head
  • E21B 43/017 Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station

Top Applicants

Top 10 applicants by patent filingsfor class E21, 2013–2023, worldwide · Source: EPO PATSTAT

  1. HALLIBURTON ENERGY SERVICES GROUP US 26,607
  2. PETROCHINA COMPANY 14,382
  3. SINOPEC (CHINA PETROCHEMICAL CORPORATION) 10,137
  4. CNPC (CHINA NATIONAL PETROLEUM CORPORATION) 6,517
  5. BAKER HUGHES US 6,269
  6. SCHLUMBERGER TECHNOLOGY US 5,929
  7. SAUDI ARABIAN OIL COMPANY SA 5,880
  8. SOUTHWEST PETROLEUM UNIVERSITY 4,477
  9. CHINA UNIVERSITY OF MINING AND TECHNOLOGY 4,357
  10. SCHLUMBERGER TECHNOLOGY NL 4,219