IPC Subgroup
E21D 11/14 Lining predominantly with metal
Introduced: September 1968
Last revised: January 2006
Full Title
Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings , e.g. by assembling > Lining predominantly with metal
Classification Context
- Section:
- FIXED CONSTRUCTIONS
- Class:
- EARTH OR ROCK DRILLING; MINING
- Subclass:
- SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
6 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- E21D 11/15 Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
- E21D 11/18 Arch members
- E21D 11/28 Longitudinal struts
- E21D 11/3 Bases for lower arch members
- E21D 11/34 Joints between vertical props and horizontal top bars
- E21D 11/36 Linings or supports specially shaped for tunnels or galleries of irregular cross-section