Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Main Group
E21D 9/00

Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Introduced: September 1968

Last revised: January 2006

Classification Context

Section:
FIXED CONSTRUCTIONS
Class:
EARTH OR ROCK DRILLING; MINING
Subclass:
SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS

Related Keywords

ADITSBORING tunnelsINSULATION of tunnelsTUNNELLING

7 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • E21D 9/01 Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
  • E21D 9/02 Driving inclined tunnels or galleries
  • E21D 9/04 Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
  • E21D 9/14 Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings