IPC Main Group
H04W 24/00 Supervisory, monitoring or testing arrangements
Introduced: January 2009
Classification Context
- Section:
- ELECTRICITY
- Class:
- ELECTRIC COMMUNICATION TECHNIQUE
- Subclass:
- WIRELESS COMMUNICATION NETWORKS
Scope Notes
Glossary: re-configuration upgrade upgrades means changing the operational characteristics of the network or network components in order to, generally, improve performance. The re-configuration or upgrade operation is normally performed after a period of monitoring or testing.
5 direct subcodes
Child Classifications
Navigate with arrow keys, Enter to open
- H04W 24/02 Arrangements for optimising operational condition
- H04W 24/04 Arrangements for maintaining operational condition
- H04W 24/06 Testing using simulated traffic
- H04W 24/08 Testing using real traffic
- H04W 24/1 Scheduling measurement reports