Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
IPC Main Group
H04W 24/00

Supervisory, monitoring or testing arrangements

Introduced: January 2009

Classification Context

Section:
ELECTRICITY
Class:
ELECTRIC COMMUNICATION TECHNIQUE
Subclass:
WIRELESS COMMUNICATION NETWORKS

Scope Notes

Glossary: re-configuration upgrade upgrades means changing the operational characteristics of the network or network components in order to, generally, improve performance. The re-configuration or upgrade operation is normally performed after a period of monitoring or testing.

5 direct subcodes

Child Classifications

Navigate with arrow keys, Enter to open

  • H04W 24/02 Arrangements for optimising operational condition
  • H04W 24/04 Arrangements for maintaining operational condition
  • H04W 24/06 Testing using simulated traffic
  • H04W 24/08 Testing using real traffic
  • H04W 24/1 Scheduling measurement reports