Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
F16L 1/032

the pipes being continuous (F16L1/038 takes precedence)

Introduced: January 1990

Title

Titles differ between systems:

IPC: the pipes being continuous

CPC: the pipes being continuous (F16L1/038 takes precedence)

Full Title

Full titles differ between systems:

IPC:

Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground > in the ground > the pipes being continuous

CPC:

Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence) > in the ground (F16L1/026 takes precedence) > the pipes being continuous (F16L1/038 takes precedence)

No child classifications to compare. This is a leaf node in both IPC and CPC.