DIFF Subgroup
F16L 1/032 the pipes being continuous (F16L1/038 takes precedence)
Introduced: January 1990
Title
Titles differ between systems:
IPC: the pipes being continuous
CPC: the pipes being continuous (F16L1/038 takes precedence)
Full Title
Full titles differ between systems:
IPC:
Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground > in the ground > the pipes being continuous
CPC:
Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence) > in the ground (F16L1/026 takes precedence) > the pipes being continuous (F16L1/038 takes precedence)
No child classifications to compare. This is a leaf node in both IPC and CPC.