Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
CPC Subgroup
G01R 11/64

Maximum meters, e.g. tariff for a period is based on maximum demand within that period

Full Title

Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption (monitoring electric consumption of electrically-propelled vehicles B60L3/00) > Special tariff meters > Maximum meters, e.g. tariff for a period is based on maximum demand within that period

1 direct subcode

Child Classifications

Navigate with arrow keys, Enter to open