Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
G01R 11/64

Maximum meters, e.g. tariff for a period is based on maximum demand within that period

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption > Special tariff meters > Maximum meters, e.g. tariff for a period is based on maximum demand within that period

CPC:

Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption (monitoring electric consumption of electrically-propelled vehicles B60L3/00) > Special tariff meters > Maximum meters, e.g. tariff for a period is based on maximum demand within that period

IPC and CPC are identically structured here. All 1 subcodes exist in both systems.

Child Classifications

Navigate with arrow keys, Enter to open

  • G01R 11/66 Circuitry IPC+CPC Available in IPC and CPC