DIFF Subgroup
B23Q 7/06 by means of pushers
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting > by means of pushers
CPC:
Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting (incorporated in working-spindles B23B13/00) > by means of pushers
No child classifications to compare. This is a leaf node in both IPC and CPC.