Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
B23Q 7/14

co-ordinated in production lines

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting > co-ordinated in production lines

CPC:

Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting (incorporated in working-spindles B23B13/00) > co-ordinated in production lines

Of 5 combined children, 0 exist in both systems.

5 codes are CPC-only extensions.

Child Classifications

Navigate with arrow keys, Enter to open