DIFF Subgroup
B23Q 7/14 co-ordinated in production lines
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting > co-ordinated in production lines
CPC:
Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting (incorporated in working-spindles B23B13/00) > co-ordinated in production lines
Of 5 combined children, 0 exist in both systems.
5 codes are CPC-only extensions.
Child Classifications
Navigate with arrow keys, Enter to open