Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E01B 25/15

Switches; Crossings

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Tracks for special kinds of railways > Tracks for cable-drawn railway vehicles > Switches; Crossings

CPC:

Tracks for special kinds of railways (systems B61B; wheel tracks on roads E01C9/02) > Tracks for cable-drawn railway vehicles > Switches; Crossings

No child classifications to compare. This is a leaf node in both IPC and CPC.