Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E01B 29/02

Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings (E01B29/04 takes precedence)

Introduced: September 1968

Title

Titles differ between systems:

IPC: Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

CPC: Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings (E01B29/04 takes precedence)

Full Title

Full titles differ between systems:

IPC:

Laying, rebuilding, or taking-up tracks; Tools or machines therefor > Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings

CPC:

Laying, rebuilding, or taking-up tracks; Tools or machines therefor (E01B27/00, E01B31/00 take precedence) > Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings (E01B29/04 takes precedence)

No child classifications to compare. This is a leaf node in both IPC and CPC.