DIFF Subgroup
E01B 29/05 Transporting, laying, removing, or renewing both rails and sleepers (as assembled units E01B29/02)
Introduced: September 1968
Title
Titles differ between systems:
IPC: Transporting, laying, removing, or renewing both rails and sleepers
CPC: Transporting, laying, removing, or renewing both rails and sleepers (as assembled units E01B29/02)
Full Title
Full titles differ between systems:
IPC:
Laying, rebuilding, or taking-up tracks; Tools or machines therefor > Transporting, laying, removing, or renewing both rails and sleepers
CPC:
Laying, rebuilding, or taking-up tracks; Tools or machines therefor (E01B27/00, E01B31/00 take precedence) > Transporting, laying, removing, or renewing both rails and sleepers (as assembled units E01B29/02)
No child classifications to compare. This is a leaf node in both IPC and CPC.