DIFF Subgroup
E01B 31/175 Full Title
Working rails, sleepers, baseplates, or the like, in or on the line; Machines, tools, or auxiliary devices specially designed therefor (characterised by features independent of use on assembled track B21, B23 - B25, B27) > Working rail or other metal track components on the spot > Removing metal from rails, rail joints, or baseplates, e.g. for deburring welds, reconditioning worn rails > by grinding
Top Applicants
Top Applicants (IPC)
Class E01,2013–2023, worldwide · Source: EPO PATSTAT
- CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP COMPANY 2,096
- CHANG AN UNIVERSITY 1,878
- ROAD & BRIDGE INTERNATIONAL COMPANY 1,796
- CREEC (CHINA RAILWAY ERYUAN ENGINEERING GROUP) 1,493
- CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP COMPANY 1,327
- CCCC FIRST HIGHWAY ENGINEERING GROUP COMPANY 1,133
- CCCC SECOND HARBOUR ENGINEERING COMPANY 1,029
- PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN AT 935
- TONGJI UNIVERSITY 899
- CATERPILLAR PAVING PRODUCTS US 868
Top Applicants (CPC)
Class E01,2013–2023, worldwide · Source: EPO PATSTAT
- PLASSER & THEURER EXPORT VON BAHNBAUMASCHINEN AT 998
- CATERPILLAR PAVING PRODUCTS US 937
- CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP COMPANY 869
- WIRTGEN DE 740
- CHINA RAILWAY MAJOR BRIDGE ENGINEERING GROUP COMPANY 685
- CHANG AN UNIVERSITY 615
- CREEC (CHINA RAILWAY ERYUAN ENGINEERING GROUP) 613
- SOUTHEAST UNIVERSITY 562
- TONGJI UNIVERSITY 500
- ROAD & BRIDGE INTERNATIONAL COMPANY 491