Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Main Group
E02D 11/00

Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D7/00, to removing only E02D9/00 )

Introduced: September 1968

Title

Titles differ between systems:

IPC: Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes

CPC: Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D7/00, to removing only E02D9/00 )

Full Title

Full titles differ between systems:

IPC:

Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes

CPC:

Methods or apparatus for both placing and removing sheet pile bulkheads, piles, or mould-pipes (features relating to placing only E02D7/00, to removing only E02D9/00 )

No child classifications to compare. This is a leaf node in both IPC and CPC.