Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Main Group
E02D 17/00

Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21)

Introduced: September 1968

Title

Titles differ between systems:

IPC: Excavations; Bordering of excavations; Making embankments

CPC: Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21)

Full Title

Full titles differ between systems:

IPC:

Excavations; Bordering of excavations; Making embankments

CPC:

Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21)

IPC and CPC are identically structured here. All 6 subcodes exist in both systems.

3 shared codes have differing titles between IPC and CPC.

Child Classifications

Navigate with arrow keys, Enter to open

  • E02D 17/13 Foundation slots ; Implements for making these slots IPC+CPC Available in IPC and CPC
  • E02D 17/16 Loosening of soil or rock, under water (for correcting streams E02B3/02; by dredgers or excavators E02F) IPC+CPC Available in IPC and CPC
  • E02D 17/18 Making embankments, (E02D17/20 takes precedence; ) IPC+CPC Available in IPC and CPC