DIFF Main Group
E02D 17/00 Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21)
Introduced: September 1968
Title
Titles differ between systems:
IPC: Excavations; Bordering of excavations; Making embankments
CPC: Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21)
Full Title
Full titles differ between systems:
IPC:
Excavations; Bordering of excavations; Making embankments
CPC:
Excavations; Bordering of excavations; Making embankments (soil-shifting apparatus E02F; earth drilling E21)
IPC and CPC are identically structured here. All 6 subcodes exist in both systems.
3 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 17/16 Loosening of soil or rock, under water (for correcting streams E02B3/02; by dredgers or excavators E02F) IPC+CPC Available in IPC and CPC