DIFF Subgroup
E02D 19/06 Restraining of underground water
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Keeping dry foundation sites or other areas in the ground > Restraining of underground water
CPC:
Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D5/02) > Restraining of underground water
IPC and CPC are identically structured here. All 3 subcodes exist in both systems.
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 19/08 by employing open ditches arranged below the level of the water IPC+CPC Available in IPC and CPC
- E02D 19/12 by damming or interrupting the passage of underground water IPC+CPC Available in IPC and CPC