Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02D 19/12

by damming or interrupting the passage of underground water

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Keeping dry foundation sites or other areas in the ground > Restraining of underground water > by damming or interrupting the passage of underground water

CPC:

Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D5/02) > Restraining of underground water > by damming or interrupting the passage of underground water

IPC and CPC are identically structured here. All 4 subcodes exist in both systems.

3 shared codes have differing titles between IPC and CPC.

Child Classifications

Navigate with arrow keys, Enter to open

  • E02D 19/14 by freezing the soil (in connection with sinking shafts E21D1/12) IPC+CPC Available in IPC and CPC
  • E02D 19/16 by placing or applying sealing substances (; consolidating by placing solidifying or pore-filling pore-filling substances in the soil E02D3/12 ) IPC+CPC Available in IPC and CPC
  • E02D 19/20 by displacing the water, e.g. by compressed air IPC+CPC Available in IPC and CPC