DIFF Subgroup
E02D 19/12 by damming or interrupting the passage of underground water
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Keeping dry foundation sites or other areas in the ground > Restraining of underground water > by damming or interrupting the passage of underground water
CPC:
Keeping dry foundation sites or other areas in the ground (sheet piles or bulkheads E02D5/02) > Restraining of underground water > by damming or interrupting the passage of underground water
IPC and CPC are identically structured here. All 4 subcodes exist in both systems.
3 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- E02D 19/14 by freezing the soil (in connection with sinking shafts E21D1/12) IPC+CPC Available in IPC and CPC
- E02D 19/16 by placing or applying sealing substances (; consolidating by placing solidifying or pore-filling pore-filling substances in the soil E02D3/12 ) IPC+CPC Available in IPC and CPC
- E02D 19/18 by making use of sealing aprons, (; sealing or joints for engineering work E02B3/16) +1 CPC IPC+CPC Available in IPC and CPC