DIFF Subgroup
E02D 23/16 Jointing caissons to the foundation soil, specially to uneven foundation soil
Introduced: September 1968
Full Title
Full titles differ between systems:
IPC:
Caissons; Construction or placing of caissons > Jointing caissons to the foundation soil, specially to uneven foundation soil
CPC:
Caissons; Construction or placing of caissons (tunnels submerged into or built in open water E02D29/063 ) > Jointing caissons to the foundation soil, specially to uneven foundation soil
No child classifications to compare. This is a leaf node in both IPC and CPC.