Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02D 29/05

at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

Introduced: January 1995

Full Title

Full titles differ between systems:

IPC:

Underground or underwater structures; Retaining walls > Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them > at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

CPC:

underground or underwater structures (underground tanks B65D88/76; hydraulic engineering, e.g. sealings or joints, E02B; underground garages E04H6/00; underground air-raid shelters E04H9/12; burial vaults E04H13/00); Retaining walls > Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them > at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench

IPC and CPC are identically structured here. All 1 subcodes exist in both systems.

IPC defines codes here since 1995.

Child Classifications

Navigate with arrow keys, Enter to open

  • E02D 29/055 further excavation of the cross-section proceeding underneath an already installed part of the structure, e.g. the roof of a tunnel since 1995 IPC+CPC Available in IPC and CPC