Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02D 5/48

Piles varying in construction along their length

Introduced: September 1968

Full Title

Full titles differ between systems:

IPC:

Bulkheads, piles, or other structural elements specially adapted to foundation engineering > Piles > Piles varying in construction along their length

CPC:

Bulkheads, piles, or other structural elements specially adapted to foundation engineering (engineering elements in general F16) > Piles (sheet piles, E02D5/02; ) > Piles varying in construction along their length

No child classifications to compare. This is a leaf node in both IPC and CPC.