Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E02F 5/22

for making embankments; for back-filling (in combination with trench excavators E02F5/12)

Introduced: September 1968

Title

Titles differ between systems:

IPC: for making embankments; for back-filling

CPC: for making embankments; for back-filling (in combination with trench excavators E02F5/12)

Full Title

Full titles differ between systems:

IPC:

Dredgers or soil-shifting machines for special purposes > for making embankments; for back-filling

CPC:

Dredgers or soil-shifting machines for special purposes > for making embankments; for back-filling (in combination with trench excavators E02F5/12)

Of 3 combined children, 2 exist in both systems.

1 codes are CPC-only extensions.

Child Classifications

Navigate with arrow keys, Enter to open

  • E02F 5/24 Depositing dredged material in mounds IPC+CPC Available in IPC and CPC
  • E02F 5/26 Combined conveying-bridges and dredgers IPC+CPC Available in IPC and CPC