E04B 5/12 with wooden beams (E04B5/14 takes precedence)
Introduced: September 1968
Title
Titles differ between systems:
IPC: with wooden beams
CPC: with wooden beams (E04B5/14 takes precedence)
Full Title
Full titles differ between systems:
Floors; Floor construction with regard to insulation; Connections specially adapted therefor > Load-carrying floor structures formed substantially of prefabricated units > with wooden beams
Floors; Floor construction with regard to insulation; Connections specially adapted therefor (elements for floors, e.g. bricks, stones, filling bodies, girders, E04C; flooring as finishing work, insulation of flooring, sectional false floors, e.g. for computers E04F15/00) > Load-carrying floor structures formed substantially of prefabricated units (E04B5/43 - E04B5/48 take precedence) > with wooden beams (E04B5/14 takes precedence)
No child classifications to compare. This is a leaf node in both IPC and CPC.