Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
E04B 9/10

Connections between parallel members of the supporting construction (E04B9/08 takes precedence)

Introduced: January 1990

Title

Titles differ between systems:

IPC: Connections between parallel members of the supporting construction

CPC: Connections between parallel members of the supporting construction (E04B9/08 takes precedence)

Full Title

Full titles differ between systems:

IPC:

Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation > characterised by constructional features of the supporting construction > Connections between parallel members of the supporting construction

CPC:

Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation (ceilings used as forms for making floors E04B5/00; coverings or linings for ceilings E04F13/00) > characterised by constructional features of the supporting construction > Connections between parallel members of the supporting construction (E04B9/08 takes precedence)

No child classifications to compare. This is a leaf node in both IPC and CPC.