Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Main Group
E04H 1/00

Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys (E04H3/00 takes precedence)

Introduced: September 1968

Title

Titles differ between systems:

IPC: Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys

CPC: Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys (E04H3/00 takes precedence)

Full Title

Full titles differ between systems:

IPC:

Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys

CPC:

Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys (E04H3/00 takes precedence)

Of 4 combined children, 3 exist in both systems.

1 codes are CPC-only extensions.

2 shared codes have differing titles between IPC and CPC.

Child Classifications

Navigate with arrow keys, Enter to open

  • E04H 1/005 CPC only CPC only
  • E04H 1/06 Office buildings; Banks (E04H1/12 takes precedence) IPC+CPC Available in IPC and CPC