Skip to content
PCE
Search Classifications
Search for IPC and CPC classification codes or keywords
DIFF Subgroup
F04C 28/22

by changing the eccentricity between cooperating members

Introduced: January 2006

Full Title

Full titles differ between systems:

IPC:

Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids > characterised by varying the volume of the working chamber > by changing the eccentricity between cooperating members

CPC:

Control of, monitoring of, or safety arrangements for, pumps or pumping installations specially adapted for elastic fluids > characterised by varying the volume of the working chamber (by changing the positions of inlet or outlet openings F04C28/10) > by changing the eccentricity between cooperating members

No child classifications to compare. This is a leaf node in both IPC and CPC.