DIFF Main Group
F04D 9/00 Priming; Preventing vapour lock
Introduced: September 1968
CPC subdivides this area 3x more granularly than IPC with 3 additional codes.
3 codes are CPC-only extensions.
1 shared codes have differing titles between IPC and CPC.
Child Classifications
Navigate with arrow keys, Enter to open
- F04D 9/04 using priming pumps; using booster pumps to prevent vapour-lock +3 CPC IPC+CPC Available in IPC and CPC