DIFF Subgroup
F16L 1/024 Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence)
Introduced: January 1990
Title
Titles differ between systems:
IPC: Laying or reclaiming pipes on land, e.g. above the ground
CPC: Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence)
Full Title
Full titles differ between systems:
IPC:
Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground
CPC:
Laying or reclaiming pipes; Repairing or joining pipes on or under water > Laying or reclaiming pipes on land, e.g. above the ground (F16L1/12 takes precedence)
Of 4 combined children, 3 exist in both systems.
1 codes are CPC-only extensions.
1 shared codes have differing titles between IPC and CPC.
IPC defines codes here since 1990.
Child Classifications
Navigate with arrow keys, Enter to open